logo

Essar Power Ltd- Repowering of Existing Combined Cycle Power Plant [CCPP] of Essar Power Ltd and Bhander Power Ltd with Coal fired Steam Generators

Sector: Natural Gas • Location: Gujarat, India

Source: India Investment Grid (IIG)

Project
Closed

Economic/Social Impact of the Project The proposed repowering power project will use pulverized-fuel fired Steam Generator technology to produce steam which will be further used to generate power using back pressure steam turbine and existing Steam Turbine. Main fuel for the power plant will be coal, which will be imported. EPoL and BPL Capacity after repowering will be 199-200 MW and 232 MW respe

Project Information FAQ

Project Information

5 Q
The project “Essar Power Ltd- Repowering of Existing Combined Cycle Power Plant [CCPP] of Essar Power Ltd and Bhander Power Ltd with Coal fired Steam Generators” is an infrastructure initiative in the Natural Gas sector, located in Gujarat, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Economic/Social Impact of the Project The proposed repowering power project will use pulverized-fuel fired Steam Generator technology to produce steam which will be further used to generate power using back pressure steam turbine and existing Steam Turbine. Main fuel for the power plant will be coal, which will be imported. EPoL and BPL Capacity after repowering will be 199-200 MW and 232 MW respectively. Presently, Essar Power LTD & Bhander Power Limited are 515 MW and 500 MW Gas based Combined Cycle Power Plants at Hazira. The plant configuration consists of three Gas Turbines of 110 MW capacity each and one steam turbine of 185 MW capacity at EPoL and three Gas Turbines 100 MW, 108 & 110 MW capacity respectively and two Steam Turbine Generators [STG 1 & 2 of 56 MW and 129 MW capacity respectively] at BPL. These plants are not being run due to non-availability of Natural Gas at feasible price. The total cost of the Repowered Projects would be INR 1256 Crore [EPoL- INR 600 Crore & BPL- INR 656 Crore]

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data