Established Road Construction
Closed · Tennessee · Last reported Mar 2024
Source: Dodge USA
The scope of work includes: A. Removal and disposal of nine CMP culverts. B. Installation of nine 18 x 30 dual wall HDPE pipes with fl ared outlets along with appropriate ditch line modifi cations and repair. C. Full depth reclamation per TDOT Special Provision SP304FDR of 23,930 SY of existing asphalt paved or chip seal roads. D. Chip seal per the materials and application rates of TDOT Standard
- Status
- Closed
- Sector
- Commercial, Road
- Location
- Dunlap, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Established Road Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work includes: A. Removal and disposal of nine CMP culverts. B. Installation of nine 18 x 30 dual wall HDPE pipes with fl ared outlets along with appropriate ditch line modifi cations and repair. C. Full depth reclamation per TDOT Special Provision SP304FDR of 23,930 SY of existing asphalt paved or chip seal roads. D. Chip seal per the materials and application rates of TDOT Standard Specifi cation Section 405 - Bituminous Seal Coat of 23,350 SY of double layer bituminous seal co... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Dunlap |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
