logo

Establishment of a plant to produce Insulated Electric wires and cables

Sector: Manufacturing (Industrial) • Location: Harar, Ethiopia

Source: United Nations Industrial Development Organization (UNIDO)

Project

This project is meant for the production of electrical wires and cables required for the construction of houses and factories. The proposed Electric Wires and cables to be produced will be specifically used as current carrying conductors in electrical installations such as in house wiring, industrial power supply & distribution cables. This project profile provides basic information on the product

Project Information FAQ

Project Information

4 Q
The project “Establishment of a plant to produce Insulated Electric wires and cables” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Harar, Ethiopia. Taiyo aggregates data on it from United Nations Industrial Development Organization (UNIDO).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project is meant for the production of electrical wires and cables required for the construction of houses and factories. The proposed Electric Wires and cables to be produced will be specifically used as current carrying conductors in electrical installations such as in house wiring, industrial power supply & distribution cables. This project profile provides basic information on the production of electric wires and LV cables. The envisaged plant will have a production capacity of 8,500 tons of different sizes of copper conductors such as Single core cables l.5 mm2 to 25 mm2and Multicore cables 4 x l.5 mm2 to 4x 50 mm2, including cables with mechanical protection for voltages up to l000 volts. The demand for these products is projected to rise from 32,868 ton in to 35,521 ton in 2025. The investment capital of the project is $ 5.3 million. The project will create employment opportunities for 119 persons.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data