ESTREITO H-ELECT POW
One of 10,000+ projects Taiyo tracks in Brazil.
Source: World Bank Group
The Estreito Hydroelectric Power Project will assist in financing equipment and materials for the transmission facilities which constitute the second stage of the Estreito Hydroelectric Project. The second stage of the project consists of two high-voltage transmission lines to the cities of Rio de Janeiro and Sao Paulo, respectively, of short high-voltage lines connecting sub-stations around the c
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Government
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ESTREITO H-ELECT POW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Estreito Hydroelectric Power Project will assist in financing equipment and materials for the transmission facilities which constitute the second stage of the Estreito Hydroelectric Project. The second stage of the project consists of two high-voltage transmission lines to the cities of Rio de Janeiro and Sao Paulo, respectively, of short high-voltage lines connecting sub-stations around the city of Rio de Janeiro and the related expansion of sub-stations. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Brazil |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
