Eswatini - Lower Usuthu Smallholder Irrigation Project (LUSIP)
Sector: Raw Materials • Location: Eswatini
Source: African Development Bank (AfDB)
Lower Usuthu Small-holder Irrigation Development Project is designed to support Government’s National Development Strategy by the development of the water resources of the Lower Usuthu Basin and addressing the socio-economic and legal constraints to further irrigation development. It aims the creation of employment, increased incomes, improved food security, minimization of random settlement an
- Sector
- Raw Materials, Commercial, Water Supply and Storage, Cement, Government
- Location
- Eswatini
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Eswatini - Lower Usuthu Smallholder Irrigation Project (LUSIP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Lower Usuthu Small-holder Irrigation Development Project is designed to support Government’s National Development Strategy by the development of the water resources of the Lower Usuthu Basin and addressing the socio-economic and legal constraints to further irrigation development. It aims the creation of employment, increased incomes, improved food security, minimization of random settlement and natural vegetation burning, intensification of production, reduced soil erosion, and supplementary input to livestock feed using farm residues and molasses. In addition, increased incomes through the project should indirectly improve health conditions through improved nutrition and possible improvement in water supply and sanitation. The expected outputs are: Under Upstream works, 200m wide concrete diversion weir, Feeder canal of capacity 13 m/s, three dams with reservoir with capacity of 155 million m3, two concrete-lined main canals 5.7 km and 24 Km long constructed as well as secondary and tertiary distribution systems for 6,500 ha developed. The project comprises four (04) main components, namely: (A) Upstream Works (including construction of 3 dams) and Distribution System, (B) Downstream Development, (C) Environmental Mitigation, and (D) Project Coordination and Management. |
Original sector | Agriculture, Forestry, Fishing |
Budget |
Location
Country | Eswatini |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Commercial, Water Supply and Storage, Cement, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Eswatini
- Swaziland- Mbabane Manzini corridor (Nondvo) multipurpose dam study
- FirstRand Rest of Africa Central Bank Mandatory Reserves Coverage
- Swaziland - Emergency Humanitarian Relief Assistance to drought affected populations
- Eswatini - Mkhondvo-Ngwavuma Water Augmentation Program Phase IA (MNWAP-1A)
- Eswatini - Komati Downstream Development Project (KDDP)
- Eswatini - Lower Usuthu Smallholder Irrigation Project Preliminary Studies Phase II
- Eswatini - Emergency Humanitarian Relief Assistance to drought affected populations
- Mbabane-Mhlambanyatsi Road (ADF)
