Eswatini - Mkondvo-Ngwavuma Water Augmentation Program (MNWAP) Study
Sector: Raw Materials • Location: Eswatini
Source: African Development Bank (AfDB)
The proposed operation is a MIC Grant of UA 1.2 million to the Government of the Kingdom of Eswatini to support the undertaking of the Mkondvo-Ngwavuma Water Augmentation Program (MNWAP) Study and a Detailed Designs. The overall goal of the program is to contribute to food security, poverty reduction and resilience to climate change, through supporting water and irrigation infrastructure developme
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed operation is a MIC Grant of UA 1.2 million to the Government of the Kingdom of Eswatini to support the undertaking of the Mkondvo-Ngwavuma Water Augmentation Program (MNWAP) Study and a Detailed Designs. The overall goal of the program is to contribute to food security, poverty reduction and resilience to climate change, through supporting water and irrigation infrastructure development in Eswatini. This feasibility study is consistent with the Bank’s 2013-2022 Strategy and its five priority areas (the High 5s), particularly Feed Africa and Improve the Quality of life of the people of Africa. The project consists of conducting feasibility studies for the construction of a dam on the Mkondvo River at Mahamba Gorge and the transfer of water to the Mahosha River (a tributary of the Ngwavuma River), for the purpose of increasing the low flow of the Ngwavuma River. It was designed because of the key role of agriculture and water development in supporting inclusive growth, job creation and poverty alleviation in Eswatini. The study has four (04) main components, namely: (i) Mpakeni Dam and Water Supply and Irrigation Development Plan and Bidding Documents, (ii) Feasibility Study for the Mkhondvo-Ngwavuma Water Resources Augmentation Project, (iii) Strategic Environmental Impact Assessment, and (iv) Detailed Design and Bidding Documents for the Water Resources Augmentation Option. It will be implemented over a period of two years between June 2020 and September 2022. The total estimated cost of the Study is UA 2,037,859 (equivalent to Eswatini Lilangeni (SZL) 26,210,000 or USD 2,832,624.68. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Raw Materials projects in Eswatini
- FirstRand Rest of Africa Central Bank Mandatory Reserves Coverage
- Swaziland- Mbabane Manzini corridor (Nondvo) multipurpose dam study
- Swaziland - Emergency Humanitarian Relief Assistance to drought affected populations
- Eswatini - Mkhondvo-Ngwavuma Water Augmentation Program Phase IA (MNWAP-1A)
- Eswatini - Mkhondvo-Ngwavuma Water Augmentation Program Phase IA (MNWAP-1A)
- Eswatini - Komati Downstream Development Project (KDDP)
- Eswatini - Lower Usuthu Smallholder Irrigation Project Preliminary Studies Phase II
- Eswatini - Emergency Humanitarian Relief Assistance to drought affected populations
