ET-Water Supply Dev & Rehab (BD FY96)
Sector: Water Supply and Storage • Location: Ethiopia
Source: World Bank Group
The main objectives of the Water Supply Development and Rehabilitation Project are to ensure the long-term viability of water supply and sanitation operations in line with the Government's regionalization policies and, in the long run, improve the health and productivity of the population. The objectives will be met by providing assistance for: 1) capacity building of the Regional Governments and
- Status
- Closed
- Sector
- Water Supply and Storage, Automotive, Waste Processing and Treatment, Commercial, Government
- Location
- Ethiopia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ET-Water Supply Dev & Rehab (BD FY96)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the Water Supply Development and Rehabilitation Project are to ensure the long-term viability of water supply and sanitation operations in line with the Government's regionalization policies and, in the long run, improve the health and productivity of the population. The objectives will be met by providing assistance for: 1) capacity building of the Regional Governments and water supply and agencies for management of urban water supply and sanitation schemes and rural water supply operations; 2) formulation of policies to ensure long-term financial and managerial viability of water supply operations, establishment of regulatory arrangements and sound investment planning by the Regional Governments and water supply agencies; and 3) short- and medium-term physical rehabilitation, augmentation and establishment of urban water supply and sanitation schemes in war-affected and the most deficient regions. The project will consist of the following components: 1) institutional capacity building, which includes water supply sector capacity building and rural water supply pilot scheme. This component will provide studies, technical assistance, training, equipment, service rigs, mobile workshops, vehicles and the construction of pilot schemes; 2) feasibility and engineering which will consist of water and sanitation scheme feasibility, engineering designs and building works designs; and 3) physical works comprising water and sanitation scheme rehabiliation as well as building works. |
Original sector | FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Ethiopia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Automotive, Waste Processing and Treatment, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Ethiopia
- Gilgel Gibe III Hydroelectric Power Project
- An expansion on producing Bottled water
- Expansion of production facility for Ethiopian spices
- Coffee processing plant
- Expansion project for bottling natural mineral water
- EIC- Children's Clothes
- Production of Envelopes and Paper Bags
- A new project on Iodized Salt production
