ETEA Lapaj SHPP
Sector: Wind • Location: Albania
Source: World Bank Group
ETEA Group, from Italy, via its subsidiary Gjo-Spa Power, developed the 13.62MW Lapaj small hydropower plant, on the Bushtrice River, Notheastern Albania. The project was expected to generate 49,865 MWh annually.
The project was reported as being "launched" (i.e. commissioned) in November 2012. The power is transmissioned from the plant via a 22km 110kV transmission line, connecting to the 110/10
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | ETEA Group, from Italy, via its subsidiary Gjo-Spa Power, developed the 13.62MW Lapaj small hydropower plant, on the Bushtrice River, Notheastern Albania. The project was expected to generate 49,865 MWh annually. The project was reported as being "launched" (i.e. commissioned) in November 2012. The power is transmissioned from the plant via a 22km 110kV transmission line, connecting to the 110/10kV Kukes HV substation. Peak turbine efficiency is 92%. Generator efficiency is 96%, aggregate efficiency is 90%. Plant load factor is 48%. The plant employs 10 people. The project negotiated a PPA with KESH, the national utility. Tariff was recorded as 3.7-6.2 ALL/kWh between 2004-2007, which were the numbers used in the feasibility study (6.2 ALL/kWh) and considered "attractive". Plant life wase expected to be 30 years. The feasibility study was completed in December 2008. ERE issued Standard Basic PPA with Public Wholesale Supplier (KESH) for small HPPs. Total project cost was EUR15 million (US$19.4 million). The project design document expected a total cost of 1.45 billion Leke (US$13.6 million), which was expected to be financed with 30% equity, 70% debt. Financial closure date was estimated at November 2012, date of commissioning. http://www.albnordic.com/files/Lapaj_12.6MW_HPP_feasibility_en.pdf The Corporate Wire, Albania's Gjo-Spa Launches 15mln euro HPP -govt., 5 November 2012 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Wind projects in Albania
- Devoll Hydropower Project
- Fidia Verbe-Selce 1 & 2 SHPP
- Energji Ashta Shpk (Ashta)
- ETEA Lapaj SHPP
- Butrinti Markat
- ADRIAtic integrated RADar-based and web-oriented information processing system NETwork to support hydro-meteorological monitoring and civil protection decision
- Albania Renewable Energy Programme: Offshore Wind Development
- Albania Renewable Energy Programme: Offshore Wind Development