ETEA Lapaj SHPP

Sector: Hydro • Location: Albania

Source: World Bank Group

Project
Active

ETEA Group, from Italy, via its subsidiary Gjo-Spa Power, developed the 13.62MW Lapaj small hydropower plant, on the Bushtrice River, Notheastern Albania. The project was expected to generate 49,865 MWh annually.

The project was reported as being "launched" (i.e. commissioned) in November 2012. The power is transmissioned from the plant via a 22km 110kV transmission line, connecting to the 110/10

Status
Prospective
Sector
Hydro, Wind, Power Transmission, Power Generation (CCGT), Commercial, Government
Location
Albania
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ETEA Lapaj SHPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ETEA Lapaj SHPP” is an infrastructure initiative in the Hydro sector, located in Albania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ETEA Group, from Italy, via its subsidiary Gjo-Spa Power, developed the 13.62MW Lapaj small hydropower plant, on the Bushtrice River, Notheastern Albania. The project was expected to generate 49,865 MWh annually. The project was reported as being "launched" (i.e. commissioned) in November 2012. The power is transmissioned from the plant via a 22km 110kV transmission line, connecting to the 110/10kV Kukes HV substation. Peak turbine efficiency is 92%. Generator efficiency is 96%, aggregate efficiency is 90%. Plant load factor is 48%. The plant employs 10 people. The project negotiated a PPA with KESH, the national utility. Tariff was recorded as 3.7-6.2 ALL/kWh between 2004-2007, which were the numbers used in the feasibility study (6.2 ALL/kWh) and considered "attractive". Plant life wase expected to be 30 years. The feasibility study was completed in December 2008. ERE issued Standard Basic PPA with Public Wholesale Supplier (KESH) for small HPPs. Total project cost was EUR15 million (US$19.4 million). The project design document expected a total cost of 1.45 billion Leke (US$13.6 million), which was expected to be financed with 30% equity, 70% debt. Financial closure date was estimated at November 2012, date of commissioning. http://www.albnordic.com/files/Lapaj_12.6MW_HPP_feasibility_en.pdf The Corporate Wire, Albania's Gjo-Spa Launches 15mln euro HPP -govt., 5 November 2012

Original sector

Energy

Budget

Location

Country

Albania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Power Transmission, Power Generation (CCGT), Commercial, Government

Article published date

2024-05-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project