ETEA Lapaj SHPP

Sector: Hydro • Location: Albania

Source: World Bank Group

Project
Active

ETEA Group, from Italy, via its subsidiary Gjo-Spa Power, developed the 13.62MW Lapaj small hydropower plant, on the Bushtrice River, Notheastern Albania. The project was expected to generate 49,865 MWh annually.

The project was reported as being "launched" (i.e. commissioned) in November 2012. The power is transmissioned from the plant via a 22km 110kV transmission line, connecting to the 110/10

Project Information FAQ

Project Information

5 Q
The project “ETEA Lapaj SHPP” is an infrastructure initiative in the Hydro sector, located in Albania. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

ETEA Group, from Italy, via its subsidiary Gjo-Spa Power, developed the 13.62MW Lapaj small hydropower plant, on the Bushtrice River, Notheastern Albania. The project was expected to generate 49,865 MWh annually. The project was reported as being "launched" (i.e. commissioned) in November 2012. The power is transmissioned from the plant via a 22km 110kV transmission line, connecting to the 110/10kV Kukes HV substation. Peak turbine efficiency is 92%. Generator efficiency is 96%, aggregate efficiency is 90%. Plant load factor is 48%. The plant employs 10 people. The project negotiated a PPA with KESH, the national utility. Tariff was recorded as 3.7-6.2 ALL/kWh between 2004-2007, which were the numbers used in the feasibility study (6.2 ALL/kWh) and considered "attractive". Plant life wase expected to be 30 years. The feasibility study was completed in December 2008. ERE issued Standard Basic PPA with Public Wholesale Supplier (KESH) for small HPPs. Total project cost was EUR15 million (US$19.4 million). The project design document expected a total cost of 1.45 billion Leke (US$13.6 million), which was expected to be financed with 30% equity, 70% debt. Financial closure date was estimated at November 2012, date of commissioning. http://www.albnordic.com/files/Lapaj_12.6MW_HPP_feasibility_en.pdf The Corporate Wire, Albania's Gjo-Spa Launches 15mln euro HPP -govt., 5 November 2012

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data