Ethete Turning Lanes
Sector: Water Supply and Storage • Location: Ethete, Wyoming, United States of America
Source: Dodge USA
This Project is titled Ethete Turning Lanes, Project No. C58-280-S132-060-0 is 0.54-miles long and Option A - Ethete South Bike Path is 2-52 miles long (STA. 187+20 to STA. 320+00). The Project includes, but is not limited to, widening existing roadway, placing gravel base, plant mix resurfacing, and plant mix surfacing bike path. The Project also includes constructing drainage improvements, insta
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Mass Transit, Automotive, Rail, Government, Commercial
- Location
- Ethete, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Ethete Turning Lanes
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Project is titled Ethete Turning Lanes, Project No. C58-280-S132-060-0 is 0.54-miles long and Option A - Ethete South Bike Path is 2-52 miles long (STA. 187+20 to STA. 320+00). The Project includes, but is not limited to, widening existing roadway, placing gravel base, plant mix resurfacing, and plant mix surfacing bike path. The Project also includes constructing drainage improvements, installing a cattle guard, constructing a bump-out, and permanent signing. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Ethete |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Mass Transit, Automotive, Rail, Government, Commercial |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
