logo

Ethiopia - Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (AATDRUP)

Sector: Commercial • Location: Ethiopia

Source: African Development Bank (AfDB)

Project

The Addis Ababa Electricity Transmission and Distribution System Rehabilitation and Modernization Project aims to extend access to the electricity grid to approximately 5 million residents of the Ethiopian capital and surrounding urban areas over a radius of 50 km in the regional state of Oromia. The project is structured around three components. The first is the rehabilitation and renovation (in

Project Information FAQ

Project Information

4 Q
The project “Ethiopia - Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (AATDRUP)” is an infrastructure initiative in the Commercial sector, located in Ethiopia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Addis Ababa Electricity Transmission and Distribution System Rehabilitation and Modernization Project aims to extend access to the electricity grid to approximately 5 million residents of the Ethiopian capital and surrounding urban areas over a radius of 50 km in the regional state of Oromia. The project is structured around three components. The first is the rehabilitation and renovation (in the short and medium term) of transmission and distribution networks in Addis Ababa. The second component is the renovation of the distribution network in the surrounding urban areas of the Oromia region, in line with the government's strategy of broad-based growth, poverty reduction and efficiency improvement in service delivery, which should contribute to inclusive economic transformation. The third component will contribute to the improvement and strengthening of the electricity supply,This should increase power supply capacity, while reducing losses along the grid and facilitate an affordable and reliable power supply for both households and businesses, social services and public buildings, with the key to increasing access rates to electricity, improving the living conditions of the population, business growth and job creation, not to mention economic growth. The total cost of the project is estimated at UA 154.39 million (US $ 209.03 million).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data