Ethiopia - Addis Ababa Transmission and Distribution System Rehabilitation and Upgrading Project (AATDRUP)
Sector: Commercial • Location: Ethiopia
Source: African Development Bank (AfDB)
The Addis Ababa Electricity Transmission and Distribution System Rehabilitation and Modernization Project aims to extend access to the electricity grid to approximately 5 million residents of the Ethiopian capital and surrounding urban areas over a radius of 50 km in the regional state of Oromia. The project is structured around three components. The first is the rehabilitation and renovation (in
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Addis Ababa Electricity Transmission and Distribution System Rehabilitation and Modernization Project aims to extend access to the electricity grid to approximately 5 million residents of the Ethiopian capital and surrounding urban areas over a radius of 50 km in the regional state of Oromia. The project is structured around three components. The first is the rehabilitation and renovation (in the short and medium term) of transmission and distribution networks in Addis Ababa. The second component is the renovation of the distribution network in the surrounding urban areas of the Oromia region, in line with the government's strategy of broad-based growth, poverty reduction and efficiency improvement in service delivery, which should contribute to inclusive economic transformation. The third component will contribute to the improvement and strengthening of the electricity supply,This should increase power supply capacity, while reducing losses along the grid and facilitate an affordable and reliable power supply for both households and businesses, social services and public buildings, with the key to increasing access rates to electricity, improving the living conditions of the population, business growth and job creation, not to mention economic growth. The total cost of the project is estimated at UA 154.39 million (US $ 209.03 million). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
