Ethiopia - Assela Wind Farm Scaling-Up Renewable Energy Program Project Preparation Grant
Sector: Raw Materials • Location: Ethiopia
Source: African Development Bank (AfDB)
Ethiopia is a least developed country (LDC) with a low level of electrification; only about 10% of the country is electrified with less than 1% of rural areas having access to electricity. In 2011, Ethiopia passed an ambitious path to sustainable development, the Climate Resilient Green Economy (CRGE) Strategy. Included in this strategy is a plan to achieve 100% electrification, by area, by 2025.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Ethiopia is a least developed country (LDC) with a low level of electrification; only about 10% of the country is electrified with less than 1% of rural areas having access to electricity. In 2011, Ethiopia passed an ambitious path to sustainable development, the Climate Resilient Green Economy (CRGE) Strategy. Included in this strategy is a plan to achieve 100% electrification, by area, by 2025. This will result in total electric power demand growing from 4 Terawatt-hr (TWh) in 2010 to a maximum of nearly53 TWh in 2025.In order to achieve this level of electrification, a significant amount of capacity must be added to the Ethiopian electricity grid. The Ethiopian Growth and Transformation Plan (GTP) envisions increasing the power generation capacity of the country from the present level of 4300MW to 12,300MW by the end of 2020. The GTP-IIalso envisions a diversification of the electricity grid, which is currently hydro power dominated. For this purpose the GTP-IIsets the target of developing 800MW wind power capacity until 2020, and 2000 MW until 2030. However, these targets require substantial investment, which can only be made viable at the anticipated scale through additional CER revenue. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
