logo
Project

Ethiopia - Assela Wind Farm Scaling-Up Renewable Energy Program Project Preparation Grant

Sector: Raw Materials • Location: Ethiopia

Source: African Development Bank (AfDB)

Ethiopia is a least developed country (LDC) with a low level of electrification; only about 10% of the country is electrified with less than 1% of rural areas having access to electricity. In 2011, Ethiopia passed an ambitious path to sustainable development, the Climate Resilient Green Economy (CRGE) Strategy. Included in this strategy is a plan to achieve 100% electrification, by area, by 2025.

Sector
Raw Materials, Power Generation (CCGT), Hydro, Wind, Road, Government
Location
Ethiopia
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Ethiopia - Assela Wind Farm Scaling-Up Renewable Energy Program Project Preparation Grant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ethiopia - Assela Wind Farm Scaling-Up Renewable Energy Program Project Preparation Grant” is an infrastructure initiative in the Raw Materials sector, located in Ethiopia. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ethiopia is a least developed country (LDC) with a low level of electrification; only about 10% of the country is electrified with less than 1% of rural areas having access to electricity. In 2011, Ethiopia passed an ambitious path to sustainable development, the Climate Resilient Green Economy (CRGE) Strategy. Included in this strategy is a plan to achieve 100% electrification, by area, by 2025. This will result in total electric power demand growing from 4 Terawatt-hr (TWh) in 2010 to a maximum of nearly53 TWh in 2025.In order to achieve this level of electrification, a significant amount of capacity must be added to the Ethiopian electricity grid. The Ethiopian Growth and Transformation Plan (GTP) envisions increasing the power generation capacity of the country from the present level of 4300MW to 12,300MW by the end of 2020. The GTP-IIalso envisions a diversification of the electricity grid, which is currently hydro power dominated. For this purpose the GTP-IIsets the target of developing 800MW wind power capacity until 2020, and 2000 MW until 2030. However, these targets require substantial investment, which can only be made viable at the anticipated scale through additional CER revenue.

Original sector

Energy

Budget

Location

Country

Ethiopia

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Power Generation (CCGT), Hydro, Wind, Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project