Ethiopia - Borana Resilient Water Development for Improved Livelihoods Program (PHASE 1)
Sector: Raw Materials • Location: Ethiopia
Source: African Development Bank (AfDB)
The Borana Resilient Water Development for Improved Livelihoods Program (PHASE 1) focuses on the impact of droughts, and sustainable recovery and resilience in water related sectors, using an Integrated Water Resources Management (IWRM) approach. It aims to provide access to integrated, sustainable, climate-resilient and gender-sensitive water and sanitation services to pastoralist communities in
- Sector
- Raw Materials, Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Government
- Location
- Ethiopia
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Ethiopia - Borana Resilient Water Development for Improved Livelihoods Program (PHASE 1)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Borana Resilient Water Development for Improved Livelihoods Program (PHASE 1) focuses on the impact of droughts, and sustainable recovery and resilience in water related sectors, using an Integrated Water Resources Management (IWRM) approach. It aims to provide access to integrated, sustainable, climate-resilient and gender-sensitive water and sanitation services to pastoralist communities in the drylands of the Borana region of Oromia. The programme covers 62 rural villages (kebeles) and 12 small towns in the with an estimated 308,576 people (of which 50% are female) and 975,750 livestock. The first phase of the programme will provide water services to an estimated 24,115 people (8% of the total population) and 83,000 livestock (9% of the total livestock) in the three woredas of Elweya, Dubluk and Yabelo in the Borana zone of the Oromia region. It will provide the basic infrastructure to anchor the second phase of monitoring, which is planned to be implemented in parallel with this phase, as soon as resources from the next loan cycle are confirmed. There are three components for Phase I of the program, namely: (i) Water Development and Institutional Sanitation, (ii) Integrated Watershed Management and Institutional Strengthening, and (iii) Program Management. |
Original sector | Water Supply & Sanitation |
Budget |
Location
Country | Ethiopia |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT), Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Ethiopia
- New project on establishment of Potato Chips
- Establishing a Joint Venture/Establishment of an additional production facility/Manufacture of food products and beverages/Amba Private Limited Company
- Production of Envelopes and Paper Bags
- Establishing a Joint Venture/Establishment of an additional production facility/Production, processing and preserving of meat and meat products/Prime Meat and Food Products
- Expansion project for roasted and processed coffee
- OLD LAND PHARMACEUTICALS P.L.C
- Establishing a Joint Venture/Establishment of an additional production facility/Growing of cereals and other crops n.e.c./Olera Agro Processing Plc
- Establishing a Joint Venture/Establishment of an additional production facility/Other animal farming; production of animal products n.e.c./Genale Migs Beeswax Processors and Exporter
