Ethiopia - Integrated Transport Program - Phase I (Jimma-Chida and Sodo-Sawla Road Upgrading Project)
Sector: Cement • Location: Ethiopia
Source: African Development Bank (AfDB)
The Ethiopia Integrated Transport Program Phase I (Jimma – Chida & Sodo-Sawla Road Upgrading Project) consist the upgrading of the existing 240 km road sections to all weather high standard asphalt concrete surfaced road with a 7m wide carriageway and 1.5m x 2 sealed shoulders. The road will connect the towns of Jimma and Sodo directly and further connect Sawla to the main trunk road network, link
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Ethiopia Integrated Transport Program Phase I (Jimma – Chida & Sodo-Sawla Road Upgrading Project) consist the upgrading of the existing 240 km road sections to all weather high standard asphalt concrete surfaced road with a 7m wide carriageway and 1.5m x 2 sealed shoulders. The road will connect the towns of Jimma and Sodo directly and further connect Sawla to the main trunk road network, linking the local populations to Addis Ababa city and the rest of the country. The project includes skills development and capacity building in transport sectoral issues and climate change, and support in women entrepreneurial capacity. In addition, the project will implement fully the environmental and social management plan including improvements in emergency response facilities at Sawla hospital. The expected outcomes include improved road network, increased travel speeds and savings in time and vehicle operating costs. Other outcomes include increased skills, knowledge and capacity in transport issues, and improved response to road safety emergencies. The project will cost UA 191.34 m. Each lot of road works will be constructed in 4 years. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
