Ethiopia - Modjo-Hawassa Highway Project – Phase 1
Sector: Government • Location: Ethiopia
Source: African Development Bank (AfDB)
The Modjo – Hawassa Highway Project (Phase I) is within the broad five-year Road Sector Development Program – RSDP-IV (2011-15) program in Ethiopia. The RSDP is an ambitious program intended to enhance road transport service throughout the country, through upgrading and road maintenance as well as build domestic contracting capacity. The current Modjo – Hawassa road is a dilapidated single 2-lane
- Sector
- Government, Education, Road
- Location
- Ethiopia
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Ethiopia - Modjo-Hawassa Highway Project – Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Modjo – Hawassa Highway Project (Phase I) is within the broad five-year Road Sector Development Program – RSDP-IV (2011-15) program in Ethiopia. The RSDP is an ambitious program intended to enhance road transport service throughout the country, through upgrading and road maintenance as well as build domestic contracting capacity. The current Modjo – Hawassa road is a dilapidated single 2-lane carriageway that has already served its design life and requires upgrading. The road section forms a link within the Cape Town to Cairo road corridor connecting southern, eastern and northern Africa. The current capacity is insufficient to cater for the growing traffic demands, including international heavy traffic. The Modjo – Hawassa Highway Project (209km) will be implemented in two phases. Phase I consists of the construction of 93 km of a new asphalt surfaced 4-lane dual carriageway road between Modjo and Zeway towns. Furthermore the Modjo- Hawassa highway lies mostly in Oromia Region and is part of the major Mombasa- Nairobi-Addis Ababa highway. This project is therefore a logical continuation of this transport expansion program and when completed in 2019, it will provide a wide range of socio-economic benefits, supporting national and regional trade. It will be implemented in 5 years. |
Original sector | Transport & Storage |
Budget |
Location
Country | Ethiopia |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Government, Education, Road |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in Ethiopia
- Gilgel Gibe III Hydroelectric Power Project
- Production of long Cut-Pasta products
- An expansion on producing Bottled water
- A project for the establishment of new production facility and new product development through a joint venture project
- Expansion of production facility for Ethiopian spices
- Coffee processing plant
- Establishing a Joint Venture/Establishment of an additional production facility/Packaging activities/Three Y Flexible Packaging Plc
- Expansion project for bottling natural mineral water