logo
Project

Ethiopia - Multi-Sectoral Approach for Stunting Reduction Project (MASReP)

Sector: Raw Materials • Location: Ethiopia

Source: African Development Bank (AfDB)

The Multi-sectoral Approach for Stunting Reduction Project (MASReP) is designed to contribute to the realization of the Ethiopian government's commitment, known as the Seqota Declaration (SD), through the implementation of a package of interventions in the selected districts of Amhara and Tigray regions of Ethiopia. The 2015 Seqota Declaration reaffirms the government's commitment to ending stunti

Sector
Raw Materials, Water Supply and Storage, Power Generation (CCGT), Consumer Products, Solar, Education, Government
Location
Ethiopia
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Ethiopia - Multi-Sectoral Approach for Stunting Reduction Project (MASReP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ethiopia - Multi-Sectoral Approach for Stunting Reduction Project (MASReP)” is an infrastructure initiative in the Raw Materials sector, located in Ethiopia. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Multi-sectoral Approach for Stunting Reduction Project (MASReP) is designed to contribute to the realization of the Ethiopian government's commitment, known as the Seqota Declaration (SD), through the implementation of a package of interventions in the selected districts of Amhara and Tigray regions of Ethiopia. The 2015 Seqota Declaration reaffirms the government's commitment to ending stunting in children under two by 2030. Indeed, malnutrition remains one of the main development challenges in Ethiopia. The project target area has the highest stunting prevalence in Ethiopia (48% of children under-five). The full project package of interventions consists of (i) infrastructure development/maintenance (water supply and irrigation schemes, health, education and agriculture facilities), (ii) livelihood support, production and promotion of nutritious food crops and livestock, and (iii) system/capacity strengthening activities. Among the 40 target woredas of the SD program, the project will implement the full package of multi-sectoral interventions in the prioritized 17 woredas while the remaining 23 woredas will benefit only from the SBCC and systems strengthening activities to complement government’s interventions. The MASReP is a fouryear project. The total project cost is UA 34.17 million with UA 22.00 million from ADF. The contribution of the Government of Ethiopia and communities is UA 11.38 and UA 0.79 million, respectively.

Original sector

Health

Budget

Location

Country

Ethiopia

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Water Supply and Storage, Power Generation (CCGT), Consumer Products, Solar, Education, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project