Ethiopia - Tulu Moye Geothermal Resource Development Development
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The project falls under Sustainable Energy Fund for Africa (SEFA)’s Green Baseload area of intervention as geothermal is one of the most reliable (high load factor) renewable energy sources in Eastern Africa, with over 15,000 MWe of generation potential. The project will be the first large-scale private sector-driven geothermal development in Africa and the first privately financed IPP in Ethiopia
- Sector
- Power Generation (CCGT), Hydro, Geothermal, Government
- Location
- Ethiopia
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Ethiopia - Tulu Moye Geothermal Resource Development Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project falls under Sustainable Energy Fund for Africa (SEFA)’s Green Baseload area of intervention as geothermal is one of the most reliable (high load factor) renewable energy sources in Eastern Africa, with over 15,000 MWe of generation potential. The project will be the first large-scale private sector-driven geothermal development in Africa and the first privately financed IPP in Ethiopia (“Tulu Moye”). The project involves geothermal resource development, construction, commissioning, and operation of a 50 MW power plant in Ethiopia under a build own operate transfer (“BOOT”) structure, to be developed for a further 100MW as the second phase. The first phase of the project is intended to be implemented in two sub-sets of 25MW each for geothermal resource development purposes only. The sub-sets arrangement is due to the capital intensity of the drilling phase, which is a huge burden for the equity investors and a lack of risk appetite from debt financiers to support the exploration drilling activities. |
Original sector | Energy |
Budget |
Location
Country | Ethiopia |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro, Geothermal, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Ethiopia
- Gilgel Gibe III Hydroelectric Power Project
- An expansion on producing Bottled water
- Coffee processing plant
- EIC- Children's Clothes
- New project on manufacturing of Pharmaceutical Products.
- Open for FDI through a minority stake/Establishment of an additional production facility of Edible oil/Purchase of new machinery and equipment/Right Edible Oil Processors Cooperatve society Plc.
- Production of Envelopes and Paper Bags
- Establishment of Refrigerator manufacturing plant
