Ethiopia Geothermal Sector Development Project
Closed · Ethiopia
Source: World Bank
The development objective of the Geothermal Sector Development Project (GSDP) is to develop geothermal resources in Ethiopia. There are four components to the project, the first component being Aluto geothermal site development. This component will finance goods, including drilling consumables and associated materials; services, including drilling contractors, the supervision engineer, reservoir e
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Geothermal, Commercial, Forest Products and Packaging, Government
- Location
- Ethiopia
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Ethiopia Geothermal Sector Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The development objective of the Geothermal Sector Development Project (GSDP) is to develop geothermal resources in Ethiopia. There are four components to the project, the first component being Aluto geothermal site development. This component will finance goods, including drilling consumables and associated materials; services, including drilling contractors, the supervision engineer, reservoir engineering, and management; drilling and testing of about 22 wells; and design and construction of a steam-gathering system connecting the producing and injection wells. The second component is the Alalobad geothermal site development. This component will finance goods, including drilling consumables and associated materials; services, including drilling contractors and the supervision engineer; and drilling and testing of about four wells. Financing from International Development Association, or IDA will be used for production drilling and testing activities, in order to establish the economic viability of the geothermal resources and finalize a feasibility study of the Alalobad geothermal site. The third component is the drilling rigs, associated accessories, and spare parts. This component will finance goods, in particular two full-size modern diesel electric drilling rigs with all associated equipment, accessories for directional drilling and both overpressure and under-pressure drilling, and a complete inventory of spare parts. Finally, the fourth component is the legal, institutional, and regulatory framework development. |
Original sector | FY17 - Energy and Extractives |
Budget |
Location
Country | Ethiopia |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Geothermal, Commercial, Forest Products and Packaging, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Ethiopia
- Gilgel Gibe III Hydroelectric Power Project
- An expansion on producing Bottled water
- Expansion of production facility for Ethiopian spices
- Coffee processing plant
- Expansion project for bottling natural mineral water
- EIC- Children's Clothes
- Production of Envelopes and Paper Bags
- A new project on Iodized Salt production
