Ethiopia-Kenya 500 kV HVDC Interconnector
Sector: Power Generation (CCGT) • Location: Ethiopia and Kenya
Source: Institute of Foreign Affairs
A 1,045-kilometre High Voltage Direct Current (HVDC) transmission line linking Wolayta Sodo in Ethiopia to Suswa in Kenya, enabling cross-border electricity trade. The initial power supply under the Power Purchase Agreement (PPA) is 200 MW, expected to increase to 400 MW. The 25-year agreement was signed in 2022 to strengthen energy integration between the two countries.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Hydro, Power Transmission
- Location
- Ethiopia
- Updated
- 22 Jul 2026
- Source
- Institute of Foreign Affairs
ConstructChat
Ask ConstructChat about Ethiopia-Kenya 500 kV HVDC Interconnector
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | operational |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 1,045-kilometre High Voltage Direct Current (HVDC) transmission line linking Wolayta Sodo in Ethiopia to Suswa in Kenya, enabling cross-border electricity trade. The initial power supply under the Power Purchase Agreement (PPA) is 200 MW, expected to increase to 400 MW. The 25-year agreement was signed in 2022 to strengthen energy integration between the two countries. |
Original sector | Energy |
Location
Country | Ethiopia |
Source
Source | Institute of Foreign Affairs |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro, Power Transmission |
Article published date | 2025-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
