Ethiopia Large-Scale Fertilizer Project
The owner, status and timeline of this project. A free account opens every field.
Source: Trendsnafrica
Dangote Industries Limited has increased its investment in Ethiopia's large-scale fertilizer project from USD 2.5 billion to more than USD 4 billion, expanding the initiative to include additional infrastructure such as a 110-kilometer gas pipeline, a 120-megawatt power plant, a polypropylene packaging facility, and an NPK fertilizer blending plant with an annual production capacity of two million
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Fertilizers, Manufacturing (Industrial), Raw Materials
- Location
- Gode, Somali regional state, Ethiopia
- Updated
- 22 Jul 2026
- Source
- Trendsnafrica
ConstructChat
Ask ConstructChat about Ethiopia Large-Scale Fertilizer Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Dangote Industries Limited has increased its investment in Ethiopia's large-scale fertilizer project from USD 2.5 billion to more than USD 4 billion, expanding the initiative to include additional infrastructure such as a 110-kilometer gas pipeline, a 120-megawatt power plant, a polypropylene packaging facility, and an NPK fertilizer blending plant with an annual production capacity of two million tons. The project aims to boost agricultural productivity, improve food security, accelerate industrialization, and enhance economic self-reliance in Ethiopia. Construction of the urea fertilizer complex began in October 2025, and once operational, it is expected to produce three million metric tons of urea annually, reducing fertilizer imports and supporting millions of farmers. |
Original sector | Industrial |
Budget |
Location
Country | Ethiopia |
State | Somali regional state |
City | Gode |
Source
Source | Trendsnafrica |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Fertilizers, Manufacturing (Industrial), Raw Materials |
Article published date | 2026-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Ethiopia
- Gilgel Gibe III Hydroelectric Power Project
- An expansion on producing Bottled water
- Coffee processing plant
- EIC- Children's Clothes
- New project on manufacturing of Pharmaceutical Products.
- Open for FDI through a minority stake/Establishment of an additional production facility of Edible oil/Purchase of new machinery and equipment/Right Edible Oil Processors Cooperatve society Plc.
- Production of Envelopes and Paper Bags
- Establishment of Refrigerator manufacturing plant
