Ethiopia-Road Sector Development Program APL4

Sector: Road • Location: Ethiopia

Source: World Bank Group

Project
Closed

The objectives of the Road Sector Development Program and Fourth Adaptable Program Loan Project for Ethiopia are to assist the Government in strengthening and increasing its road transport infrastructure and its reliability, and strengthening the institutional efficiency in road sector management. Three are three components to the project. The first component of the project is upgrading of federal

Project Information FAQ

Project Information

5 Q
The project “Ethiopia-Road Sector Development Program APL4” is an infrastructure initiative in the Road sector, located in Ethiopia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The objectives of the Road Sector Development Program and Fourth Adaptable Program Loan Project for Ethiopia are to assist the Government in strengthening and increasing its road transport infrastructure and its reliability, and strengthening the institutional efficiency in road sector management. Three are three components to the project. The first component of the project is upgrading of federal link roads and related supervision services. This component comprises upgrading of two link roads from an existing gravel surface to asphalt surface, and one from an existing earth road to asphalt surface road as follows: (i) upgrading of Mekenajo-Dembi Dolo Link road sub-project (181 km asphalt concrete); (ii) upgrading of Welkite-Hosaina Link road sub-project (121 km asphalt concrete); (iii) upgrading of Ankober-Awash Arba Link road sub-project (89 km asphalt surface treatment); and (iv) construction supervision of these three roads including implementing the associated environmental, safety, and resettlement plans and mitigation of adverse social impacts, as well as sectional design review of Ankober-Awash Arba road. The second component of the project is Ethiopian Roads Authority (ERA) modernization/sector capacity building. This component various institutional strengthening/reform and capacity building activities will be undertaken, comprising: (i) preparatory study toward establishing a highway engineering research center: and (ii) technical advisory services (TA) to prepare and conduct Harmonized 'comprehensive capacity building'. ERA staff training will also be included. The third component of the project is network management studies. This component will be conducted comprising: (i) maintenance needs assessment and updating of road financing study; (ii) transport and poverty observatories (TPOs); and (iii) preparatory studies for the next phase of Road Sector Development Program (RSDP) and the Universal Rural Access Roads Program (URAP).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data