logo
ProjectClosed

Ethiopia-Road Sector Development Program APL4

The status, timeline and source of this project. A free account opens every field.

Source: World Bank

The objectives of the Road Sector Development Program and Fourth Adaptable Program Loan Project for Ethiopia are to assist the Government in strengthening and increasing its road transport infrastructure and its reliability, and strengthening the institutional efficiency in road sector management. Three are three components to the project. The first component of the project is upgrading of federal

Status
Closed
Sector
Road, Cement, Commercial, Government
Location
Ethiopia
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Ethiopia-Road Sector Development Program APL4

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Ethiopia-Road Sector Development Program APL4” is an infrastructure initiative in the Road sector, located in Ethiopia. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of the Road Sector Development Program and Fourth Adaptable Program Loan Project for Ethiopia are to assist the Government in strengthening and increasing its road transport infrastructure and its reliability, and strengthening the institutional efficiency in road sector management. Three are three components to the project. The first component of the project is upgrading of federal link roads and related supervision services. This component comprises upgrading of two link roads from an existing gravel surface to asphalt surface, and one from an existing earth road to asphalt surface road as follows: (i) upgrading of Mekenajo-Dembi Dolo Link road sub-project (181 km asphalt concrete); (ii) upgrading of Welkite-Hosaina Link road sub-project (121 km asphalt concrete); (iii) upgrading of Ankober-Awash Arba Link road sub-project (89 km asphalt surface treatment); and (iv) construction supervision of these three roads including implementing the associated environmental, safety, and resettlement plans and mitigation of adverse social impacts, as well as sectional design review of Ankober-Awash Arba road. The second component of the project is Ethiopian Roads Authority (ERA) modernization/sector capacity building. This component various institutional strengthening/reform and capacity building activities will be undertaken, comprising: (i) preparatory study toward establishing a highway engineering research center: and (ii) technical advisory services (TA) to prepare and conduct Harmonized 'comprehensive capacity building'. ERA staff training will also be included. The third component of the project is network management studies. This component will be conducted comprising: (i) maintenance needs assessment and updating of road financing study; (ii) transport and poverty observatories (TPOs); and (iii) preparatory studies for the next phase of Road Sector Development Program (RSDP) and the Universal Rural Access Roads Program (URAP).

Original sector

FY17 - Transportation

Budget

Location

Country

Ethiopia

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Road, Cement, Commercial, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project