Ethiopia Solar

Sector: Water Supply and Storage • Location: Ethiopia

Source: International Finance Corporation (IFC)

Project
Completed

The World Bank Group obtained an agreement from EEP to move forward on a Scaling Solar Program in Ethiopia by way of a signed FASA on October 10, 2016.

IFC will act as PPP Transaction Advisor to EEP to support the implementation of grid connected solar PV installations on an IPP basis for a total installed capacity of 500MW over a number of sites in a series of procurement rounds. The projects ar

Project Information FAQ

Project Information

5 Q
The project “Ethiopia Solar” is an infrastructure initiative in the Water Supply and Storage sector, located in Ethiopia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The World Bank Group obtained an agreement from EEP to move forward on a Scaling Solar Program in Ethiopia by way of a signed FASA on October 10, 2016. IFC will act as PPP Transaction Advisor to EEP to support the implementation of grid connected solar PV installations on an IPP basis for a total installed capacity of 500MW over a number of sites in a series of procurement rounds. The projects are expected to be Ethiopia's first solar IPPs and will not only provide competitively priced clean power but also reduce Ethiopia's dependence on hydro resources by diversifying the energy supply mix. C3P will assist EEP as transaction advisor with activities split into two phases: 1) Project Preparation a. Site selection support EEP has prepared a shortlist of potential sites for the project. IFC would help EEP to finalise the selection of the specific locations for the two projects, based on information provided by EEP and reflecting a combination of technical, logistical and environmental and social considerations, based on IFC Performance Standards. b. Technical and E&S due diligence Once EEP has selected the project sites, the project team would conduct an E&S scoping study as well as all relevant site specific technical studies (solar resource assessment, grid connection conditions, etc.). c. Legal and regulatory due diligence The project team would perform a legal and regulatory due diligence exercise covering all legal, regulatory and policy matters impacting on the project. 2) Bid Preparation a. Localization of the template Scaling Solar documents Based on the outcome of the legal and technical due diligence, and consultations with the client, the project team would adapt the Scaling Solar documents to suit the context of the country and that of the project. b. Consultation with IFC Investment A fundamental part of the Scaling Solar model is the offer by other parts of the WBG (IFC Investment, MIGA and IDA) of financing and credit enhancement instruments on a stapled basis. For these instruments to be offered to all bidders, these other parts of the WBG require a final review of the 'localized' Scaling Solar documents. The project team and the client would therefore share these with colleagues across the WBG for their review and response (following the guidance of our COI colleagues at all times). A two-step tender process will be launched, with an initial Request for Qualification and a subsequent Request for Proposals, both following the Scaling Solar templates. The project team will assist EEP in consulting with qualified bidders and subsequently evaluating their proposals and selecting winning bidders. IFC Advisory's involvement will cease at commercial close, to avoid conflicts of interest arising on the (possible) entry of other WBG entities into the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data