logo

ETHIOPIA: Supporting technical sustainability of Ethiopian Electric Power (EEP) by RTE International

Sector: Power Generation (CCGT) • Location: France

Source: Proparco Groupe AFD (Agence Française de Développement)

Project
Closed

The technical support offered by this project is based on the relationship of trust and proximity developed between the Ethiopian public operator (EEP) and French electric transmission operator RTE international (RTEi).RTE will support EEP through the following actions: Diagnosing and making recommendations on the specifications and maintenance of different categories of strategic and costly asset

Project Information FAQ

Project Information

4 Q
The project “ETHIOPIA: Supporting technical sustainability of Ethiopian Electric Power (EEP) by RTE International” is an infrastructure initiative in the Power Generation (CCGT) sector, located in France. Taiyo aggregates data on it from Proparco Groupe AFD (Agence Française de Développement).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The technical support offered by this project is based on the relationship of trust and proximity developed between the Ethiopian public operator (EEP) and French electric transmission operator RTE international (RTEi).RTE will support EEP through the following actions: Diagnosing and making recommendations on the specifications and maintenance of different categories of strategic and costly assets.A total review of transmission system protection settings, covering all fault protection systems that currently protect 200 substations, 400 power transformers and 330 transmission lines.Complete diagnostics on the existing 400 EEP power transformers and propose a preventive or corrective action plan for critical assets.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data