logo

Ethopia - Ethiopia Djibouti Second Power Interconnection Project, Phase II

Sector: Manufacturing (Industrial) • Location: Multinational

Source: African Development Bank (AfDB)

Project

The proposed project marks a new milestone in boosting regional integration in Eastern Africa, particularly in the Horn of Africa sub-region by enhancing cross-border trade in electricity. The 1st Ethiopia-Djibouti Interconnection project has been operational for the last 10 years and the power exchange between the two countries also increased within the same period from 155 GWh in 2011 to 532 GWh

Project Information FAQ

Project Information

4 Q
The project “Ethopia - Ethiopia Djibouti Second Power Interconnection Project, Phase II” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project marks a new milestone in boosting regional integration in Eastern Africa, particularly in the Horn of Africa sub-region by enhancing cross-border trade in electricity. The 1st Ethiopia-Djibouti Interconnection project has been operational for the last 10 years and the power exchange between the two countries also increased within the same period from 155 GWh in 2011 to 532 GWh in 2020. Since the first interconnector was commissioned, in addition to the increase in demand in Djibouti, the industrial and railway line development around Dire Dawa in Ethiopia introduced transmission network congestion problems. Hence, the proposed Ethiopia-Djibouti 230 kV second transmission interconnection from Semera (Ethiopia) to Nagad (Djibouti) is the best option to increase by more than 30% the clean and relatively cheaper power supply to Djibouti and allow Ethiopia to increase foreign exchange revenue from power trade while reducing the amount of fossil fuelgenerated electricity in Djibouti. This project involves (i) the construction of 230 kV double circuit Transmission Line from Semera (Ethiopia) to Nagad (Djibouti). The line length is 292 km (102 km in Ethiopia and 190 km in Djibouti). Each circuit will have a rated power transfer capacity of 160 MW (ii) an extension of the existing Semera 230 kV Substation (Ethiopia) and extension of 230/63/20 kV substation at Nagad (Djibouti, (iii) strengthening of the existing 230 Kv transmission line between Kombolcha-Mile to Semera, 170 km long; and construction of 230 kV new substation at Mile and extension of Kombolocha and Semera existing 230 kV substations (Ethiopia), (iv) Last mile connection in Djibouti; (v) Technical Assistance and Capacity Building on Master Plan study and Power Trade Agreements and creating strong trading units in EEP (« Ethiopian Electric Power ») and EdD (« Electricite de Djibouti »). It will be implemented over a period of 48 months.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data