Ethopia - Ethiopia Djibouti Second Power Interconnection Project, Phase II
Sector: Manufacturing (Industrial) • Location: Multinational
Source: African Development Bank (AfDB)
The proposed project marks a new milestone in boosting regional integration in Eastern Africa, particularly in the Horn of Africa sub-region by enhancing cross-border trade in electricity. The 1st Ethiopia-Djibouti Interconnection project has been operational for the last 10 years and the power exchange between the two countries also increased within the same period from 155 GWh in 2011 to 532 GWh
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project marks a new milestone in boosting regional integration in Eastern Africa, particularly in the Horn of Africa sub-region by enhancing cross-border trade in electricity. The 1st Ethiopia-Djibouti Interconnection project has been operational for the last 10 years and the power exchange between the two countries also increased within the same period from 155 GWh in 2011 to 532 GWh in 2020. Since the first interconnector was commissioned, in addition to the increase in demand in Djibouti, the industrial and railway line development around Dire Dawa in Ethiopia introduced transmission network congestion problems. Hence, the proposed Ethiopia-Djibouti 230 kV second transmission interconnection from Semera (Ethiopia) to Nagad (Djibouti) is the best option to increase by more than 30% the clean and relatively cheaper power supply to Djibouti and allow Ethiopia to increase foreign exchange revenue from power trade while reducing the amount of fossil fuelgenerated electricity in Djibouti. This project involves (i) the construction of 230 kV double circuit Transmission Line from Semera (Ethiopia) to Nagad (Djibouti). The line length is 292 km (102 km in Ethiopia and 190 km in Djibouti). Each circuit will have a rated power transfer capacity of 160 MW (ii) an extension of the existing Semera 230 kV Substation (Ethiopia) and extension of 230/63/20 kV substation at Nagad (Djibouti, (iii) strengthening of the existing 230 Kv transmission line between Kombolcha-Mile to Semera, 170 km long; and construction of 230 kV new substation at Mile and extension of Kombolocha and Semera existing 230 kV substations (Ethiopia), (iv) Last mile connection in Djibouti; (v) Technical Assistance and Capacity Building on Master Plan study and Power Trade Agreements and creating strong trading units in EEP (« Ethiopian Electric Power ») and EdD (« Electricite de Djibouti »). It will be implemented over a period of 48 months. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
