logo
Project

Ethopia - Ethiopia Djibouti Second Power Interconnection Project, Phase II

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The proposed project marks a new milestone in boosting regional integration in Eastern Africa, particularly in the Horn of Africa sub-region by enhancing cross-border trade in electricity. The 1st Ethiopia-Djibouti Interconnection project has been operational for the last 10 years and the power exchange between the two countries also increased within the same period from 155 GWh in 2011 to 532 GWh

Sector
Manufacturing (Industrial), Commercial, Rail, Power Transmission, Power Generation (CCGT), Mass Transit, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Ethopia - Ethiopia Djibouti Second Power Interconnection Project, Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Ethopia - Ethiopia Djibouti Second Power Interconnection Project, Phase II” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project marks a new milestone in boosting regional integration in Eastern Africa, particularly in the Horn of Africa sub-region by enhancing cross-border trade in electricity. The 1st Ethiopia-Djibouti Interconnection project has been operational for the last 10 years and the power exchange between the two countries also increased within the same period from 155 GWh in 2011 to 532 GWh in 2020. Since the first interconnector was commissioned, in addition to the increase in demand in Djibouti, the industrial and railway line development around Dire Dawa in Ethiopia introduced transmission network congestion problems. Hence, the proposed Ethiopia-Djibouti 230 kV second transmission interconnection from Semera (Ethiopia) to Nagad (Djibouti) is the best option to increase by more than 30% the clean and relatively cheaper power supply to Djibouti and allow Ethiopia to increase foreign exchange revenue from power trade while reducing the amount of fossil fuelgenerated electricity in Djibouti. This project involves (i) the construction of 230 kV double circuit Transmission Line from Semera (Ethiopia) to Nagad (Djibouti). The line length is 292 km (102 km in Ethiopia and 190 km in Djibouti). Each circuit will have a rated power transfer capacity of 160 MW (ii) an extension of the existing Semera 230 kV Substation (Ethiopia) and extension of 230/63/20 kV substation at Nagad (Djibouti, (iii) strengthening of the existing 230 Kv transmission line between Kombolcha-Mile to Semera, 170 km long; and construction of 230 kV new substation at Mile and extension of Kombolocha and Semera existing 230 kV substations (Ethiopia), (iv) Last mile connection in Djibouti; (v) Technical Assistance and Capacity Building on Master Plan study and Power Trade Agreements and creating strong trading units in EEP (« Ethiopian Electric Power ») and EdD (« Electricite de Djibouti »). It will be implemented over a period of 48 months.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial, Rail, Power Transmission, Power Generation (CCGT), Mass Transit, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project