ETUDE D'INTERCONNEXION PAYS DU NIL EQUAT
Sector: Power Generation (CCGT) • Location: Multinational
Source: African Development Bank (AfDB)
The study on the electrical interconnection of the member countries of the Equatorial Lakes region of the Nile is an appropriate response to the constraints and difficulties of electricity supply in the sub region. It fits perfectly into the 'regional electricity exchange project' contained in the NBI Joint Vision Program whose study financed by the Trust Fund managed by the World Bank is underway
- Sector
- Power Generation (CCGT), Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about ETUDE D'INTERCONNEXION PAYS DU NIL EQUAT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The study on the electrical interconnection of the member countries of the Equatorial Lakes region of the Nile is an appropriate response to the constraints and difficulties of electricity supply in the sub region. It fits perfectly into the 'regional electricity exchange project' contained in the NBI Joint Vision Program whose study financed by the Trust Fund managed by the World Bank is underway. This project aims to create and support a regional electricity market among the countries of this region through the establishment of a Nile Basin Power Forum and conducting a comprehensive study of supply, demand, and long-term power exchange opportunities across the basin. The study will be carried out in three phases. The first phase will consist of a summary review of the feasibility of the planned interconnections and, where appropriate, the updating of existing preliminary interconnection studies between a number of countries. The second phase will be dedicated to the technical, economic, financial and environmental feasibility studies of the interconnections retained at the end of the previous phase. The third phase will include detailed pre-project studies as well as bidding documents for all selected interconnections. The implementation of the interconnection projects that will result from this study will allow the increase of electricity and a greater supply of electricity at reasonable prices in the long term, which should promote the economic development of the sub-region. It will be executed over a period of 18 months with a net cost of taxes and taxes estimated at approximately UA 2.11 million. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Ghana - Togo - Benin Power Interconnect
- Multinational- Ruzizi III regional hydropower plant project
- Multinational - Scaling-up the Clean Cooking Industry in Africa
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Kigali/Bujumbura oil products pipeline feasability study
- Multinational - Uganda – DRC Power Transmission Study
- Multinational - Study on the Cameroon-Chad Electricity Interconnection Project
