logo

ETUDE D'INTERCONNEXION PAYS DU NIL EQUAT

Sector: Power Generation (CCGT) • Location: Multinational

Source: African Development Bank (AfDB)

Project

The study on the electrical interconnection of the member countries of the Equatorial Lakes region of the Nile is an appropriate response to the constraints and difficulties of electricity supply in the sub region. It fits perfectly into the 'regional electricity exchange project' contained in the NBI Joint Vision Program whose study financed by the Trust Fund managed by the World Bank is underway

Project Information FAQ

Project Information

4 Q
The project “ETUDE D'INTERCONNEXION PAYS DU NIL EQUAT” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The study on the electrical interconnection of the member countries of the Equatorial Lakes region of the Nile is an appropriate response to the constraints and difficulties of electricity supply in the sub region. It fits perfectly into the 'regional electricity exchange project' contained in the NBI Joint Vision Program whose study financed by the Trust Fund managed by the World Bank is underway. This project aims to create and support a regional electricity market among the countries of this region through the establishment of a Nile Basin Power Forum and conducting a comprehensive study of supply, demand, and long-term power exchange opportunities across the basin. The study will be carried out in three phases. The first phase will consist of a summary review of the feasibility of the planned interconnections and, where appropriate, the updating of existing preliminary interconnection studies between a number of countries. The second phase will be dedicated to the technical, economic, financial and environmental feasibility studies of the interconnections retained at the end of the previous phase. The third phase will include detailed pre-project studies as well as bidding documents for all selected interconnections. The implementation of the interconnection projects that will result from this study will allow the increase of electricity and a greater supply of electricity at reasonable prices in the long term, which should promote the economic development of the sub-region. It will be executed over a period of 18 months with a net cost of taxes and taxes estimated at approximately UA 2.11 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data