ETUDE D'INTERCONNEXION PAYS DU NIL EQUAT
Sector: Power Generation (CCGT) • Location: Multinational
Source: African Development Bank (AfDB)
The study on the electrical interconnection of the member countries of the Equatorial Lakes region of the Nile is an appropriate response to the constraints and difficulties of electricity supply in the sub region. It fits perfectly into the 'regional electricity exchange project' contained in the NBI Joint Vision Program whose study financed by the Trust Fund managed by the World Bank is underway
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The study on the electrical interconnection of the member countries of the Equatorial Lakes region of the Nile is an appropriate response to the constraints and difficulties of electricity supply in the sub region. It fits perfectly into the 'regional electricity exchange project' contained in the NBI Joint Vision Program whose study financed by the Trust Fund managed by the World Bank is underway. This project aims to create and support a regional electricity market among the countries of this region through the establishment of a Nile Basin Power Forum and conducting a comprehensive study of supply, demand, and long-term power exchange opportunities across the basin. The study will be carried out in three phases. The first phase will consist of a summary review of the feasibility of the planned interconnections and, where appropriate, the updating of existing preliminary interconnection studies between a number of countries. The second phase will be dedicated to the technical, economic, financial and environmental feasibility studies of the interconnections retained at the end of the previous phase. The third phase will include detailed pre-project studies as well as bidding documents for all selected interconnections. The implementation of the interconnection projects that will result from this study will allow the increase of electricity and a greater supply of electricity at reasonable prices in the long term, which should promote the economic development of the sub-region. It will be executed over a period of 18 months with a net cost of taxes and taxes estimated at approximately UA 2.11 million. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
