logo

ETUDE MOY. PROD.&TRANSP.ENER. ELC.(OMVG)

Sector: Power Generation (CCGT) • Location: Multinational

Source: African Development Bank (AfDB)

Project

This study is part of the realization of the Sambangalou hydroelectric project and the interconnection of the electricity networks of the OMVG member countries. The study will enable countries to have data on the means of production and distribution, to plan interventions in the sub-sector, in order to minimize their costs, and to have an appropriate institutional and tariff structure to ensure a

Project Information FAQ

Project Information

4 Q
The project “ETUDE MOY. PROD.&TRANSP.ENER. ELC.(OMVG)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This study is part of the realization of the Sambangalou hydroelectric project and the interconnection of the electricity networks of the OMVG member countries. The study will enable countries to have data on the means of production and distribution, to plan interventions in the sub-sector, in order to minimize their costs, and to have an appropriate institutional and tariff structure to ensure a sustainable development of the electrification program capable of promoting activities, generating jobs and generating income. Finally, it will make it possible to evaluate the interest of future users of electricity, to verify the adequacy of their revenues to new charges and to better appreciate their contribution to guarantee the sustainable development of the electrification program. The study will run for a total of twenty-three (23) months.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data