logo
Project

ETUDE MOY. PROD.&TRANSP.ENER. ELC.(OMVG)

Sector: Power Generation (CCGT) • Location: Multinational

Source: African Development Bank (AfDB)

This study is part of the realization of the Sambangalou hydroelectric project and the interconnection of the electricity networks of the OMVG member countries. The study will enable countries to have data on the means of production and distribution, to plan interventions in the sub-sector, in order to minimize their costs, and to have an appropriate institutional and tariff structure to ensure a

Sector
Power Generation (CCGT), Hydro, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about ETUDE MOY. PROD.&TRANSP.ENER. ELC.(OMVG)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “ETUDE MOY. PROD.&TRANSP.ENER. ELC.(OMVG)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This study is part of the realization of the Sambangalou hydroelectric project and the interconnection of the electricity networks of the OMVG member countries. The study will enable countries to have data on the means of production and distribution, to plan interventions in the sub-sector, in order to minimize their costs, and to have an appropriate institutional and tariff structure to ensure a sustainable development of the electrification program capable of promoting activities, generating jobs and generating income. Finally, it will make it possible to evaluate the interest of future users of electricity, to verify the adequacy of their revenues to new charges and to better appreciate their contribution to guarantee the sustainable development of the electrification program. The study will run for a total of twenty-three (23) months.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project