ETVG - Empresa de Transmissao de Varzea Grande

Sector: Steel • Location: Brazil

Source: World Bank Group

Project
Active

In June 2010, the Brazilian company Alupar (fomerly known as Alusa) was awarded in a competitive bidding process the contract to build and operate the Varzea Grande Substation located at the state of Mato Grosso.

Besides ETEP, six other companies took part in the contest: the Spanish company COBRA INSTALACIONES Y SERVICIOS S.A.; the Spanish company ABENGOA CONCESSOES BRASIL HOLDING S/A; the state

Status
Prospective
Sector
Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ETVG - Empresa de Transmissao de Varzea Grande

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ETVG - Empresa de Transmissao de Varzea Grande” is an infrastructure initiative in the Steel sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In June 2010, the Brazilian company Alupar (fomerly known as Alusa) was awarded in a competitive bidding process the contract to build and operate the Varzea Grande Substation located at the state of Mato Grosso. Besides ETEP, six other companies took part in the contest: the Spanish company COBRA INSTALACIONES Y SERVICIOS S.A.; the Spanish company ABENGOA CONCESSOES BRASIL HOLDING S/A; the state-owned company ELETRONORTE; the Brazilian company ORTENG EQUIPAMENTOS E SISTEMAS LTDA; the Brazilian company ENGEGLOBAL CONSTRUCOES LTDA; and the Brazilian company ATP ENGENHARIA LTDA. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Alupar presented the lowest offer, a total value of US$ 1.7 million (BRL 3 million), 13.22% below the ceiling set by the regulatory agency. The contract was signed in November 2010, and the sponsor created the company Empresa de Transmissao de Varzea Grande S.A. to lead the project during the 30-year contract period. The sponsor committed to invest US$ 44.6 million (BRL 28.8 million) in the transmission line. Enviromental clearence was awarded in May 2011. Construction works commenced in February 2012 and were concluded by December 2012. Financial closure was based on construction progress. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Steel, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project