EUCHEE CREEK TRAIL CONNECTOR
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Georgia Department of Transportation (GDOT)
Euchee Creek Trail Connector is located within two scopes of work: the first along Harlem-Grovetown Road, and the second along SR223/Wrightsboro Road, both in the City of Grovetown, Columbia County, GA. The first scope will be a multi-use trail beginning at the northern terminus of phase 3 (PI 0009018) of the Euchee Creek Trail Corridor. The trail will extend 0.5 miles to Harlem-Grovetown Road. A
- Status
- Closed
- Sector
- Car parking, Road, Government, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about EUCHEE CREEK TRAIL CONNECTOR
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Euchee Creek Trail Connector is located within two scopes of work: the first along Harlem-Grovetown Road, and the second along SR223/Wrightsboro Road, both in the City of Grovetown, Columbia County, GA. The first scope will be a multi-use trail beginning at the northern terminus of phase 3 (PI 0009018) of the Euchee Creek Trail Corridor. The trail will extend 0.5 miles to Harlem-Grovetown Road. A 600 ft asphalt drive will connect the road to a small parking area. The second scope of work will involve enhancements to the existing northern end of the trail corridor. A section of SR223 will be restriped to create a parking area. A cul-de-sac will be constructed at the end of the old roadway. Decorative signage will be placed at the entrance of the parking area. Both scopes comply with ADA standards. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Government, Automotive |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
