Eurimbula Hybrid Facility
Sector: Solar • Location: Gladstone, Queensland, Australia
Source: Energy-Storage.News
A 1.3GWh solar-plus-storage site combining 696MWp of solar PV generation with a 666MW/1,332MWh battery energy storage system (BESS), located within the proposed Central Queensland renewable energy zone, approximately 50km southeast of Gladstone, Queensland, Australia. The project includes an onsite substation and connection to the National Electricity Market via existing 275kV transmission lines.
- Status
- Prospective
- Sector
- Solar, Power Generation (CCGT), Energy Storage
- Location
- Gladstone, Queensland, Australia
- Updated
- 22 Jul 2026
- Source
- Energy-Storage.News
ConstructChat
Ask ConstructChat about Eurimbula Hybrid Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 1.3GWh solar-plus-storage site combining 696MWp of solar PV generation with a 666MW/1,332MWh battery energy storage system (BESS), located within the proposed Central Queensland renewable energy zone, approximately 50km southeast of Gladstone, Queensland, Australia. The project includes an onsite substation and connection to the National Electricity Market via existing 275kV transmission lines. |
Original sector | Energy |
Location
Country | Australia |
State | Queensland |
City | Gladstone |
Source
Source | Energy-Storage.News |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Energy Storage |
Article published date | 2025-05-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
