logo

Europe's First Data Centre Microgrid

Sector: Energy Storage • Location: Dublin, Ireland

Source: Bolsamania

Project
Under Construction

Pure Data Centres Group (Pure DC) and AVK have launched Europe's first large-scale, 110 MW on-site microgrid at Pure DC's Dublin campus. The microgrid supports early-phase site operational resilience for data centre operations before full integration with the national electricity system. It is designed to operate as part of a hybrid energy configuration combining grid electricity with on-site infr

Project Information FAQ

Project Information

3 Q
The project “Europe's First Data Centre Microgrid” is an infrastructure initiative in the Energy Storage sector, located in Dublin, Ireland. Taiyo aggregates data on it from Bolsamania.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Pure Data Centres Group (Pure DC) and AVK have launched Europe's first large-scale, 110 MW on-site microgrid at Pure DC's Dublin campus. The microgrid supports early-phase site operational resilience for data centre operations before full integration with the national electricity system. It is designed to operate as part of a hybrid energy configuration combining grid electricity with on-site infrastructure to enhance flexibility, resilience, and system stability. The microgrid includes three interconnected energy centres, combined heat and power capability, waste heat recovery, rainwater harvesting, and a battery energy storage system to support renewable energy integration and decarbonisation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data