Europe’s Largest Electrolyzer
Sector: Government • Location: Ludwigshafen, Rhineland-Palatinate, Germany
Source: Hydrogen Central
The 54MW PEM electrolyzer, built by BASF in collaboration with Siemens Energy, is designed to produce up to 8,000 tons of hydrogen annually, significantly reducing carbon emissions in chemical production. This project integrates 72 stacks at the Ludwigshafen site, marking a major step towards achieving climate targets in the industry.
- Status
- Under Construction
- Sector
- Government, Hydrogen, Chemical (Industrial), Manufacturing (Industrial)
- Location
- Ludwigshafen, Rhineland-Palatinate, Germany
- Updated
- 22 Jul 2026
- Source
- Hydrogen Central
ConstructChat
Ask ConstructChat about Europe’s Largest Electrolyzer
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 54MW PEM electrolyzer, built by BASF in collaboration with Siemens Energy, is designed to produce up to 8,000 tons of hydrogen annually, significantly reducing carbon emissions in chemical production. This project integrates 72 stacks at the Ludwigshafen site, marking a major step towards achieving climate targets in the industry. |
Original sector | Energy |
Budget |
Location
Country | Germany |
State | Rhineland-Palatinate |
City | Ludwigshafen |
Source
Source | Hydrogen Central |
URL |
More Details
Record type | Project |
Sector | Government, Hydrogen, Chemical (Industrial), Manufacturing (Industrial) |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
