EURUS
One of 10,000+ projects Taiyo tracks in Mexico.
Source: International Finance Corporation (IFC)
Eurus SAPI de CV (“Eurus” or the “Company”) is a special purpose vehicle incorporated in 2006 under Mexican law for the development, construction and operation of a 250.5 MW wind farm and associated transmission assets in the La Venta Ejido, Juchitán de Zaragoza Municipality of the State of Oaxaca, Mexico (the “Project”). The Project will utilize 167 1.5 MW AW70 Class I turbines manufactured by A
- Status
- Closed
- Sector
- Raw Materials, Commercial, Wind, Cement, Government, Natural Gas, Power Generation (CCGT)
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about EURUS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Eurus SAPI de CV (“Eurus” or the “Company”) is a special purpose vehicle incorporated in 2006 under Mexican law for the development, construction and operation of a 250.5 MW wind farm and associated transmission assets in the La Venta Ejido, Juchitán de Zaragoza Municipality of the State of Oaxaca, Mexico (the “Project”). The Project will utilize 167 1.5 MW AW70 Class I turbines manufactured by Acciona Windpower (“AWP”), and benefits from an exceptional wind resource with high average wind speeds matched by few locations in the world. Project construction is well advanced; to date, all 167 turbines had been erected, of which 110 (165 MW or 66%) have been connected to the grid and declared operational. The substation and related transmission assets are complete. Eurus is 94% owned by Acciona Energía México S. de R.L. de CV (“AEM”), itself a wholly owned subsidiary of Acciona Energía S.A. of Spain (“AE” or the “Sponsor”). The Project is being developed under Mexico’s autoabastecimiento, or autogeneration, framework. As such, the remaining 6% shareholding in the Company is owned directly and indirectly by Cemex México SA de CV (“Cemex México”), who is supplying itself with the Project’s output pursuant to a 20-year power purchase agreement (“PPA”) with the Company. Cemex México originally initiated development of the Project for a source of clean, low cost, fixed price energy, and selected AE to take over ownership and development of the Project in 2006. |
Original sector | BC - Wind Power - Renewable Energy Generation |
Location
Country | Mexico |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Commercial, Wind, Cement, Government, Natural Gas, Power Generation (CCGT) |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
