logo
ProjectClosed

EV Charging Infrastructure-US 19 Campus-ARPA

One of 10,000+ projects Taiyo tracks in Florida.

Source: Dodge USA

Install 208/240VAC service and mount County-provided charging units on contractor-provided pedestals to charge two (2) Ford Lightning pickup trucks.

Status
Closed
Sector
Electric Vehicles (EVs), Power Generation (CCGT), Government, Automotive, Manufacturing (Industrial), Commercial
Location
Clearwater, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about EV Charging Infrastructure-US 19 Campus-ARPA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “EV Charging Infrastructure-US 19 Campus-ARPA” is an infrastructure initiative in the Electric Vehicles (EVs) sector, located in Clearwater, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Install 208/240VAC service and mount County-provided charging units on contractor-provided pedestals to charge two (2) Ford Lightning pickup trucks.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Clearwater

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Electric Vehicles (EVs), Power Generation (CCGT), Government, Automotive, Manufacturing (Industrial), Commercial

Article published date

2024-09-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project