EV Cougar Hall, Library & Valley Modernization
Closed · California · Last reported Sep 2024
Source: Dodge USA
The contractor will provide all necessary labor, materials, and equipment to install surface-mounted campus entrance fencing onto existing site concrete, as detailed in these contract documents. New fencing is approx. (390)Three hundred ninety linear feet of prefabricated aluminum 6-foot-high fence with factory applied powder coated finish; Bok Modern Blade and Post 6-Foot-Height Modular Fence wit
- Status
- Closed
- Sector
- Electric Vehicles (EVs), Metal, Steel, Manufacturing (Industrial), Cement, Commercial, Education, Automotive, Government, Power Generation (CCGT)
- Location
- San Jose, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about EV Cougar Hall, Library & Valley Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The contractor will provide all necessary labor, materials, and equipment to install surface-mounted campus entrance fencing onto existing site concrete, as detailed in these contract documents. New fencing is approx. (390)Three hundred ninety linear feet of prefabricated aluminum 6-foot-high fence with factory applied powder coated finish; Bok Modern Blade and Post 6-Foot-Height Modular Fence with A38 pattern or approved equal. Complete fencing installation requires all fence panels, posts, ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Jose |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Metal, Steel, Manufacturing (Industrial), Cement, Commercial, Education, Automotive, Government, Power Generation (CCGT) |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 20 MDOULES 8 KW INSTALL EV CHARGER
- QLINE Streetcar Overhead Catenary System
- Metropolitan Park
- Sierra Regency Roof Eve Extensions
- 466135 CLOUD PL NE Local Roadway Paving Restoration
- 378944 Alley-47076042 Citywide Alley Restoration
- Community Food Projects Competitive Grant Program
- Hydrogen Delivery Technologies
