EV Testing at Camp Atterbury
The owner, status and timeline of this project. A free account opens every field.
Source: The Manila Times
U.S. Energy® and PRŪV Mobility completed EV testing at Camp Atterbury using a Level 3 Volt Vault EV charging unit. This collaboration aimed to address the EV charging infrastructure gap in the Midwest for on-road and aerial vehicle testing.
- Status
- Closed
- Sector
- Electric Vehicles (EVs), Automotive, Road
- Location
- Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- The Manila Times
ConstructChat
Ask ConstructChat about EV Testing at Camp Atterbury
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | U.S. Energy® and PRŪV Mobility completed EV testing at Camp Atterbury using a Level 3 Volt Vault EV charging unit. This collaboration aimed to address the EV charging infrastructure gap in the Midwest for on-road and aerial vehicle testing. |
Location
Country | United States of America (USA) |
State | Indiana |
Source
Source | The Manila Times |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Automotive, Road |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in United States
- New Orleans BioInnovation Center
- MSU Grand Rapids Research Centre, Michigan, USA
- Silver Line Gateway Project, Massachusetts
- Arranta’s New Commercial-Ready Manufacturing Facility, Watertown, Massachusetts
- Upsher-Smiths’ Pharmaceutical Manufacturing Facility, Minnesota, USA
- Annual Meeting of Stockholders
- HVIP Deadline Approaching: Don’t Miss Out on Incentives for Your Zero-Emission Fleet Before 2025
- Xos DC Fast Chargers
