EV Upgrade Infrastructure Upgrade
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The contract price shall include the: supply of all materials, labour, apparatus, fixtures, and tools necessary to complete, perfect and test any portion of the apparatus and equipment herein in a substantial manner and in compliance with the requirements of the drawings and specifications to include the supply and installation of the following. .1 New weatherproof, Type 3R, 1600A, BC Hydro distri
- Status
- Prospective
- Sector
- Hydro, Automotive, Electric Vehicles (EVs), Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Richmond, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about EV Upgrade Infrastructure Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The contract price shall include the: supply of all materials, labour, apparatus, fixtures, and tools necessary to complete, perfect and test any portion of the apparatus and equipment herein in a substantial manner and in compliance with the requirements of the drawings and specifications to include the supply and installation of the following. .1 New weatherproof, Type 3R, 1600A, BC Hydro distribution and metering kiosk c/w 1600A main distribution centre and new 800A EV panel. .2 Manholes, ... |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Richmond |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Automotive, Electric Vehicles (EVs), Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
