Evanston HS Multi-Recreational Facility
One of 8,596 projects Taiyo tracks in Wyoming.
Source: Dodge USA
The project consists of all labor, material, equipment, and incidentals necessary to complete work at the following project: Site improvements for the installation of two ASATI Air Dome Structures (133 x 90 each). The Air Dome structures, mechanical/ electrical equipment, foundation steel angles, man-doors, turn-style doors, and other hardware are provided by the District and are in storage in Eva
- Status
- Closed
- Sector
- Power Generation (CCGT), Steel, Metal, Commercial, Education, Manufacturing (Industrial)
- Location
- Evanston, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Evanston HS Multi-Recreational Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of all labor, material, equipment, and incidentals necessary to complete work at the following project: Site improvements for the installation of two ASATI Air Dome Structures (133 x 90 each). The Air Dome structures, mechanical/ electrical equipment, foundation steel angles, man-doors, turn-style doors, and other hardware are provided by the District and are in storage in Evanston. In addition to the assembly and erection of the two air domes and equipment the work, in g... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Evanston |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Steel, Metal, Commercial, Education, Manufacturing (Industrial) |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
