EVCC Monte Cristo Hall Demolition
Sector: Commercial • Location: Everett, Washington, United States of America
Source: Dodge USA
Both the Monte Cristo and Annex buildings are to be abated and demolished. These footprints will be filled and graded per the drawings. Landscaping and paving will finish out the restoration of the site. Existing elevated walkway at Baker Hall to be modified with railings and a mesh gate. Electrical modifications to the Baker Hall Elevator, and Glacier Hall as noted in documents.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Both the Monte Cristo and Annex buildings are to be abated and demolished. These footprints will be filled and graded per the drawings. Landscaping and paving will finish out the restoration of the site. Existing elevated walkway at Baker Hall to be modified with railings and a mesh gate. Electrical modifications to the Baker Hall Elevator, and Glacier Hall as noted in documents. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
