EVCS Accessible Base Modification
Sector: Hydro • Location: Ottawa, Ontario, Canada
Source: Dodge
Modify existing EV charging stations in front of 580 Booth Street, bases, sidewalks and curbs as required to meet code requirements - EXCAVATE AREA OF WORK AS INDICATED. POUR CONCRETE PAD AS INDICATED POUR NEW CURD AS INDICATED MODIFY EXISTING CHARGING STATION AS INDICATED RE-GRADE SURROUNDING AREA AS NEED AND HYDRO SEED REPAIR/REINSTATE ASPHALT ADJACENT TO AREA OF WORK
- Status
- Closed
- Sector
- Hydro, Cement, Government, Automotive, Road, Manufacturing (Industrial), Electric Vehicles (EVs), Car parking, Commercial, Power Generation (CCGT)
- Location
- Ottawa, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about EVCS Accessible Base Modification
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Modify existing EV charging stations in front of 580 Booth Street, bases, sidewalks and curbs as required to meet code requirements - EXCAVATE AREA OF WORK AS INDICATED. POUR CONCRETE PAD AS INDICATED POUR NEW CURD AS INDICATED MODIFY EXISTING CHARGING STATION AS INDICATED RE-GRADE SURROUNDING AREA AS NEED AND HYDRO SEED REPAIR/REINSTATE ASPHALT ADJACENT TO AREA OF WORK |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Ottawa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Hydro, Cement, Government, Automotive, Road, Manufacturing (Industrial), Electric Vehicles (EVs), Car parking, Commercial, Power Generation (CCGT) |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
