Evelyn Sharp Field Hangar Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Furnishing all labor, materials and equipment and performing all work necessary to: Construct Box Hangar (80 x 90 ) and Approach. In general, this work will require the following approximate quantities: Unclassified Excavation (451 CY); Borrow Excavation (8902 CY); 6 Crushed Aggregate Base Course (412 SY); 6 Concrete Pavement (400 SY); 3/c #4 600 V Cables (244 LF); Non-Encased Electrical Conduit (
- Status
- Closed
- Sector
- Aerospace & Defense, Telecommunications, Government, Cement, Power Generation (CCGT), Manufacturing (Industrial), Road, Commercial, Cable car, Automotive
- Location
- Ord, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Evelyn Sharp Field Hangar Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnishing all labor, materials and equipment and performing all work necessary to: Construct Box Hangar (80 x 90 ) and Approach. In general, this work will require the following approximate quantities: Unclassified Excavation (451 CY); Borrow Excavation (8902 CY); 6 Crushed Aggregate Base Course (412 SY); 6 Concrete Pavement (400 SY); 3/c #4 600 V Cables (244 LF); Non-Encased Electrical Conduit (224 LF); Box Hangar (80 x 90 ); Seeding, Bonded Fiber Matric |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Ord |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Aerospace & Defense, Telecommunications, Government, Cement, Power Generation (CCGT), Manufacturing (Industrial), Road, Commercial, Cable car, Automotive |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Aerospace & Defense projects in United States of America
- SAT Terminal B
- Southwest Airlines BWI New Tech Ops Hangar East
- SFO United Airlines Terminal 3 Ticket Counter Redesign and Break Room Refresh
- TPA Parking Garage & Administration Building
- MDW Terminal & Concourse
- Seattle-Tacoma International Airport (SEA) International Arrivals Facility
- LAX Tom Bradley International Terminal Renovation, Apron, & Concourse Demolition
- SJC North Concourse
