Everett Link Extension
Planned · Washington · Last reported Apr 2026
Source: Lynnwood Times
The Everett Link Extension is a light rail project scheduled to start between 2037 and 2041, providing approximately 16 miles of light rail and six new stations connecting Snohomish County residents to the regional Link light rail network. The project includes the construction of the OMF North facility to support system operations and accommodate a larger train fleet. The project is currently in t
- Status
- Prospective
- Sector
- Rail
- Location
- Everett, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Lynnwood Times
ConstructChat
Ask ConstructChat about Everett Link Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Everett Link Extension is a light rail project scheduled to start between 2037 and 2041, providing approximately 16 miles of light rail and six new stations connecting Snohomish County residents to the regional Link light rail network. The project includes the construction of the OMF North facility to support system operations and accommodate a larger train fleet. The project is currently in the environmental review phase, including preparation of an Environmental Impact Statement (EIS). |
Original sector | Transportation |
Location
Country | United States of America (USA) |
State | Washington |
City | Everett |
Source
Source | Lynnwood Times |
URL |
More Details
Record type | Project |
Sector | Rail |
Article published date | 2026-04-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
