Everglades Substation Phase 2
Sector: Power Generation (CCGT) • Location: North Fort Myers, Florida, United States of America
Source: Dodge USA
Second phase of construction of the new Everglades substation to include the installation of but not limited to 138 kV and 25 kV structures, lighting arresters, HV circuit switch, voltage regulators, control panels, and etc
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial
- Location
- North Fort Myers, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Everglades Substation Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Second phase of construction of the new Everglades substation to include the installation of but not limited to 138 kV and 25 kV structures, lighting arresters, HV circuit switch, voltage regulators, control panels, and etc |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | North Fort Myers |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
