Everhart Limestone Replacement
Sector: Metal • Location: Mchenry, Maryland, United States of America
Source: Dodge USA
The purpose of this project is to replace areas of the limestone within two treatment cells, with new high calcium carbonate limestone. The existing limestone, which has become clogged and armored with metal precipitates, will be stockpiled adjacent to the site where it can dry and weather, resulting in the metal precipitates flaking off rendering the stone reusable. The project also includes the
- Status
- Closed
- Sector
- Metal, Hotel, Manufacturing (Industrial), Road, Commercial
- Location
- Mchenry, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Everhart Limestone Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of this project is to replace areas of the limestone within two treatment cells, with new high calcium carbonate limestone. The existing limestone, which has become clogged and armored with metal precipitates, will be stockpiled adjacent to the site where it can dry and weather, resulting in the metal precipitates flaking off rendering the stone reusable. The project also includes the installation of any necessary sediment and erosion control components and revegetation |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Mchenry |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Hotel, Manufacturing (Industrial), Road, Commercial |
Article published date | 2024-12-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
