logo
ProjectActive

EVN Bulgarevo Wind Farm

Sector: Wind • Location: Bulgaria

Source: World Bank Group

EVN-Enertrag Kavarna was planning the development of the 80 MW Bulgarevo wind farm, near Balgarevo and Poruchik Chunchevo village - cape Kaliakra. The project was to be deveped in two stages. The 20 MW first stage was to be completed and connected to the national grid in the second quarter of 2010, totalling 25 2 MW turbines. The 30 MW second stage is under development, with no clear time schedule

Status
Prospective
Sector
Wind, Government, Power Generation (CCGT), Raw Materials, Water Supply and Storage, Commercial
Location
Bulgaria
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about EVN Bulgarevo Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EVN Bulgarevo Wind Farm” is an infrastructure initiative in the Wind sector, located in Bulgaria. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

EVN-Enertrag Kavarna was planning the development of the 80 MW Bulgarevo wind farm, near Balgarevo and Poruchik Chunchevo village - cape Kaliakra. The project was to be deveped in two stages. The 20 MW first stage was to be completed and connected to the national grid in the second quarter of 2010, totalling 25 2 MW turbines. The 30 MW second stage is under development, with no clear time schedule available as of October 2011. EVN-Enertrag Kavarna was a joint venture between EVN Naturkraft of Austria (70%) and German Enertrag (30%). EVN was first listed on the Austrian stock exchange in 1989. The development rights for the project were initially won by Universum Energy in two tenders held by the local municipality in 2004. Universum Energy was a joint venture between local and German firms, which initially planned for the development of a 69 MW project. Universum Energy received approval from the Varna Regional Inspectorate for Environments and Waters (RIOSV Varna) in July 2005. Further development was delayed by environmental groups, with their final appeal rejected in 2008. EVN-Enertrag Kavarna took over the project in December 2008. The investment costs of the first stage were estimated at EUR100 million ($133 million). Details on financing or estimated costs for the second stage were not available as of October 2011. Pushed from 2011.

Original sector

Energy

Budget

Location

Country

Bulgaria

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Government, Power Generation (CCGT), Raw Materials, Water Supply and Storage, Commercial

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project