EVN Bulgarevo Wind Farm
Sector: Wind • Location: Bulgaria
Source: World Bank Group
EVN-Enertrag Kavarna was planning the development of the 80 MW Bulgarevo wind farm, near Balgarevo and Poruchik Chunchevo village - cape Kaliakra. The project was to be deveped in two stages. The 20 MW first stage was to be completed and connected to the national grid in the second quarter of 2010, totalling 25 2 MW turbines. The 30 MW second stage is under development, with no clear time schedule
- Status
- Prospective
- Sector
- Wind, Government, Power Generation (CCGT), Raw Materials, Water Supply and Storage, Commercial
- Location
- Bulgaria
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about EVN Bulgarevo Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | EVN-Enertrag Kavarna was planning the development of the 80 MW Bulgarevo wind farm, near Balgarevo and Poruchik Chunchevo village - cape Kaliakra. The project was to be deveped in two stages. The 20 MW first stage was to be completed and connected to the national grid in the second quarter of 2010, totalling 25 2 MW turbines. The 30 MW second stage is under development, with no clear time schedule available as of October 2011. EVN-Enertrag Kavarna was a joint venture between EVN Naturkraft of Austria (70%) and German Enertrag (30%). EVN was first listed on the Austrian stock exchange in 1989. The development rights for the project were initially won by Universum Energy in two tenders held by the local municipality in 2004. Universum Energy was a joint venture between local and German firms, which initially planned for the development of a 69 MW project. Universum Energy received approval from the Varna Regional Inspectorate for Environments and Waters (RIOSV Varna) in July 2005. Further development was delayed by environmental groups, with their final appeal rejected in 2008. EVN-Enertrag Kavarna took over the project in December 2008. The investment costs of the first stage were estimated at EUR100 million ($133 million). Details on financing or estimated costs for the second stage were not available as of October 2011. Pushed from 2011. |
Original sector | Energy |
Budget |
Location
Country | Bulgaria |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Government, Power Generation (CCGT), Raw Materials, Water Supply and Storage, Commercial |
Article published date | 2024-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project