Ewoyaa Lithium Project
Sector: Mining • Location: Central Region, Ghana
Source: News Ghana
The Ewoyaa Lithium Project in Ghana's Central Region is the first lithium mine in Ghana to receive full parliamentary backing. It holds an estimated 36.8 million tonnes of ore at 1.24% lithium oxide, with a projected output of 3.6 million tonnes of spodumene concentrate over a 12-year mine life. The project is being acquired by China's Huayou Cobalt through the acquisition of Atlantic Lithium Limi
- Status
- Prospective
- Sector
- Mining
- Location
- Central Region, Ghana
- Updated
- 22 Jul 2026
- Source
- News Ghana
ConstructChat
Ask ConstructChat about Ewoyaa Lithium Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Ewoyaa Lithium Project in Ghana's Central Region is the first lithium mine in Ghana to receive full parliamentary backing. It holds an estimated 36.8 million tonnes of ore at 1.24% lithium oxide, with a projected output of 3.6 million tonnes of spodumene concentrate over a 12-year mine life. The project is being acquired by China's Huayou Cobalt through the acquisition of Atlantic Lithium Limited for approximately US$210 million. |
Original sector | Mining |
Budget |
Location
Country | Ghana |
State | Central Region |
Source
Source | News Ghana |
URL |
More Details
Record type | Project |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
